Friday, November 9, 2012

Cabin Build Days 3-10

Floor on and first outer wall up and sheeted

Raising the roof
still raising the roof and building trusses

Second outer wall up and starting to insulate. Kids pulling nails.

Insulating and sheeting the roof

adding back the tin, building an over hang. Down stairs windows all in. The BIG REVEAL tearing down the plastic between the two sections

Down stairs interior walls

Upstairs floor and windows