Columns were made using half a 55 galon drum. Rebar rods were staked into the drums and down into the ground. Then the barrels were filled with concreat.

Then large steel beams were placed on blocks of wood that were set on top of the barrels.


Then the wood floor was framed on top of the ateel beams.
The next step will be to Tyvec under the framed floor which will require the floor to be lifted temporarily from the beams. Then they will put insulation in the floor, then sheet the floor.